The Equipt Method
The order a gym gets built in.
Most gym projects start with an equipment list. That is the last decision, not the first. Below is the order a gym gets built in, what gets locked at each stage, and what it costs to change afterwards. Each stage carries one question to put to any supplier before you sign, Equipt included. Five questions is usually enough to tell whether the people quoting you have built one of these before.
The short version
Five questions to put to whoever quotes you.
- 01“Who did you assume is in this room at peak, and where did that number come from?”
- 02“Show me the floor plan with the walking routes marked, not just the equipment positions.”
- 03“What is the lead time on the slowest item in this quote, and what happens to my opening date if it slips?”
- 04“Is the install crew your own staff or a subcontractor, and who do I call on day one if a rig sits 40mm out?”
- 05“What happens 30 days after handover?”
Screenshot this and take it into the next meeting. Each question is explained below, along with the answer that should worry you.
Why order first
Most projects run the sequence backwards.
How most projects run
The order that works
No cost
Consultation
Low
Layout
High
Equipment
Severe
Installation
Highest
Handover
Cost of changing a decision, by the stage it lands in: Consultation, No cost. Layout, Low. Equipment, High. Installation, Severe. Handover, Highest.
The five stages
- 01
Consultation
Who the room is for.
Who trains here, when they train, how many are on the floor at peak, and what the room has to earn. Not a brand, not a budget, not a wish list.
This is the cheapest stage to change and the most expensive to skip. Every decision after it inherits the answer, so a wrong assumption here does not show up until the floor is quiet at 7pm.
Ask any supplier
“Who did you assume is in this room at peak, and where did that number come from?”
Worry if: They answer with a brand name or a budget instead of a person.
- 02
Layout
Where people move.
Zones, walking routes, dead space, sightlines, where the noise sits and where it does not. The floor plan gets drawn before a single machine is chosen.
Once flooring is down and anchor points are set, a layout change means lifting floor and re-drilling. This is the stage where projects quietly lose weeks.
Ask any supplier
“Show me the floor plan with the walking routes marked, not just the equipment positions.”
Worry if: They send an equipment list and call it a layout.
- 03
Equipment
What goes on the floor, and when it can get there.
The spec and the tier, chosen against how people actually train rather than what fills a catalogue page. This is also where the calendar takes over from the design.
Lead times are what turn a design decision into a calendar decision. Order before the layout is settled and you are changing something that is already on a ship.
Ask any supplier
“What is the lead time on the slowest item in this quote, and what happens to my opening date if it slips?”
Worry if: You get one number for the whole quote.
Already have the space? Send the floor plan and Equipt marks up what the current layout is costing you, at no charge. Send the floor plan
- 04
Installation
Who is actually in the room.
Who fits it, and who carries the problem when something does not line up. Equipt installs with its own team rather than subcontractors. That costs more, and it means the people who specified the room are answerable for the room.
Install is where the drawing meets the building. Tolerances, power positions, ceiling clearance. A crew that did not read the spec will make decisions on your floor at 4pm on a Thursday, and you will live with them.
Ask any supplier
“Is the install crew your own staff or a subcontractor, and who do I call on day one if a rig sits 40mm out?”
Worry if: You cannot get a name.
- 05
Handover
Whether it survives the first month.
Whether the floor gets used the way it was designed. Staff walkthrough, member induction, the service plan, and the route to parts when something breaks.
There is nothing to reverse here, which is exactly why it is the stage most suppliers skip. The invoice is already paid. A floor nobody was taught to run is how a good build ends up feeling average by month three.
Ask any supplier
“What happens 30 days after handover?”
Worry if: Nothing does.
Run these on Equipt too.
Those five questions work on any supplier, Equipt included. If you are mid-quote with someone else, ask them. It reads faster than a brochure and it tells you whether they have built this before.
Next step
Start at stage one.
Answer a few questions about your space and see a zoned layout and a capacity model for it, free. Or send the floor plan and a named coordinator replies inside one working day.